Quick answer
Quick answer: back up the original, pick the right format/settings, run a small batch, spot-check the output. Kit depends on size/material/delivery/install.
Why it matters
Get the shortest path working before optimizing.
Size.
Step by step
- Check size/material/anchoring/permits/HOA/wind/snow.
- Separate kit/custom/footings/install/roof.
- Get 2-3 quotes; confirm material/anchoring/warranty.
- Contract states scope/footings/payment/warranty.
Common mistakes
- Pergola price only, not footings/install.
- Ignoring wind/snow/permits/HOA.
- Not checking anchoring/material/warranty.
- No payment/footing terms.
Checklist
- Size/material/anchoring/permits/HOA.
- Kit/custom/footings/install/roof.
- Wind/snow/drainage/rot.
- Warranty/payment/contract.
- Budget/maintenance/lighting.
Key facts
- Size.
- Delivery.
- Install.
FAQ
What is the quick answer for Kit?
Quick answer: back up the original, pick the right format/settings, run a small batch, spot-check the output. Kit depends on size/material/delivery/install.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Angi